Sunday 27 October 2013

Caesarstone, downpipes & Corking (Bricks)

Downpipes
Externally of the house, the downpipes have been attached to the house and the bricks filled with corking in the gaps (expansion joints), leaving just the cladding to be done outside. (Front facade)

Corking
Inside the house, the caesarstone bench tops have been fitted to all bench areas (excluding laundry). It has come up very nicely and better than the laminate finish in the bathroom areas  (20mm in areas, slightly thicker in the kitchen).
Caesarstone - Powder Room
Caesarstone - Bathroom

Caesarstone -Ensuite

Caesarstone -Kitchen (Island is thicker)

Finally a picture of the bathroom, that was missed on the last post: (Shower to right, out of the image)