Sunday 3 November 2013

Plumbing in, Flooring started

Ensuite
The tiles have now been cleaned, looking much better. The plumbing works have been fitted off, with basins, taps & shower fixings attached. The large mirrors have been fitted, which are apparently custom made by measurements of the space (Different tiles would mean different height glass I guess!)
Ensuite Spa-bath

Bathroom
The bathroom is coming together well too, looking like a mini version of the ensuite. The shower screen glass should be installed within the next week or two.

Laminate Floorboards
 The laminate floorboard installation has started, with a bit of work to be done. They will look great once cleaned up. They are of a very light oak type color.
Internet - NBN Ready
 External connectivity to the internet is all ready for NBN Co to install / do their works.

External Tapware
Although far from the ideal location, our external taps have been installed. We may have to look at installing our own taps at the rear of the house, where the majority of lawn/plants will be!