Shell of the house |
Our frame stage has now completed, with the trusses installed. They have also tacked on the extra noggins in the locations we requested (excluding bathrooms at current).
It is really taking the shape of a house now and its interesting to see and know the design of the place - hopefully that will make it easier for post hand over works in the future (both short and long term).
We have organised for New Home Inspections to inspect our frame stage and provide us with a written report. We are wanting to ensure that any problems are flagged as soon as possible, rectified in a timely manner and that the building is to code (which we know nothing of - so hiring a professional!).
Next stage is for the gutters & the colourbond roof to be attached. Looking forward to that and pictures to follow for that stage as well.
Right side of house |
No comments:
Post a Comment